Commissioning

SKU: 0-8500In stock

Installation, Commissioning and Warranty Policy

Due to the number of installation issues encountered with end users, Airlux Technologies requires that all systems be installed by qualified personnel with proven experience in plumbing and the installation of pressurized hydronic water systems. Proper installation is essential to ensure the safe and reliable operation of the equipment.

To safeguard product performance and maintain warranty coverage, we only supply systems to end users together with a mandatory commissioning service. Before the system is placed into operation, it undergoes a comprehensive commissioning procedure consisting of a 24-point inspection and performance test to verify that the installation is functioning correctly at the time of commissioning.

Commissioning is a verification of the system’s condition at the specific moment the inspection and testing are performed. It does not constitute a continuing guarantee of the installation or its future condition. Any issues arising after commissioning—including, but not limited to, leaks, damage caused by subsequent modifications, improper operation, inadequate maintenance, external influences, component failures outside the scope of commissioning, or changes to the installation—are not covered by the commissioning service and remain the responsibility of the owner and/or installing contractor, except where otherwise required by applicable law.

Commissioning fees are based solely on the labor required to perform the commissioning activities. Travel-related expenses, including but not limited to airline tickets, ground transportation, hotel accommodation, meals, visa costs (if applicable), and other reasonable daily expenses, are charged separately. All travel expenses are calculated from the Airlux Technologies headquarters.

Product Features:

Product Specifications:

Opticlimate RevomaxII Installation Manual V1.7 Online

5 MB March 18, 2026

Opticlimate RevomaxII User Manual V1.3 Online 1

2 MB March 18, 2026

RevomaxII Installation Checklist V1 1

20 KB March 17, 2026

Revomax Opticlimate Specsheet

215 KB March 17, 2026

Opticlimate RevomaxII Cleaning Manual V1 English

151 KB March 17, 2026

Opticlimate RevomaxII Cleaning Manual V1 Deutsch

152 KB March 17, 2026

Opticlimate RevomaxII Air Ducting Guide

135 KB March 17, 2026

Opticlimate RevomaxII Water Connection Overview

41 KB March 17, 2026

Sensor Placement Guide 3

528 KB July 28, 2026

Opticlimate Water Cooler Manual V1.0 1

3 MB June 18, 2026

Dimlux Smartbox User Manual V1 1

3 MB June 18, 2026